Augmenting the existing road from km 786.000 to km 978.400 (approx. 192.4 km) Varanasi Aurangabad section of National Highway No. 2 (NH2) in the State of Uttar Pradesh and Bihar by Six Laning on design, build, finance, operate and transfer ('DBFOT") basis ("Project"). Letter of Award for "Execution of Civil and associated works for structure works from CH Km 843.000 to Km 862.000 on Item Rate Contract Basis" in the state of Bihar, India
The Durgavati River is a significant tributary of the Karmanasa River in Bihar. The River Bridge constructed across Durgavati, which ease the transit duration.
Principal Employer - NHAI
Contractor - SOMA INDUS Varanasi Aurangabad Tollway Pvt. Ltd
Work Value - 53.42 Cr
Key Strength
Construction of Structures between Km 367.200 to Km 406.030 in NH - 66 (Talgaon to Kalmath section) in the state of Maharashtra.
The project works taken on back to basis for Structures between 38.83 Kms. And sucessfully completed in time and handovered in time to KCCIPL (HAM Project)
Principal Employer - NHAI
Contractor - KCC Buildcon Pvt Ltd
Work Value - 32.07 Cr
Key Strength
Key Strength
Construction of Koradi Flyover of 390 M @ Ch. 11+285 in MH- Section for the Project "Four Laning Of Nagpur-Saoner-Betul-section of NH-69 from Km 3+000 to Km 59+300 in the State Maharashtra and Km. 137/0 To Km 257/400 in the State of Madhya Pradesh on DBFOT (Annuity) basis".
The Flyover located in prime market area, 4lane elevated structure improved the traffic congestion and enhance road safety at this Junction
Principal Employer - NHAI
Contractor - Oriental Structural Engineers Pvt. Ltd.
Work Value - 27.77 Cr
Execution of Structure works for Development of Six Lane Kaliagura - Baunsaguar Section of NH-130-CD Road from km 249+000 to km 293+000 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode. Letter of Award for "Execution of Civil and associated works for structure work at CH Km 273+500 on Item Rate Contract Basis" in the state of odisha
The work involving Major Bridges / Viaduct and the maximum Pier Shaft height about 30 meter from Ground level
Principal Employer - NHAI
Contractor - H G Infra Engineering Limited
Work Value - 22.30 Cr
Key Strength