•  

    +91 124 4081522

  •  

    contact@viplindia.in

Ongoing Projects

Description of work Principal Employer Work Value EPC Contractor
Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur – Gondal – Rajkot section from km 117.600 to km 185.000 on NH-27 (old NH-8B) in the State of Gujarat on EPC mode. NHAI 89.30 Cr Vidya Infrabuilt Pvt. Ltd (Direct from NHAI)
Up-gradation to Two lane with paved shoulder from Km. 12+850 to Km.20+300 of 7.450 Km. Length on Goha-Khellenai section and a link road to Goha Village of 2.016 Km on NH-244 in Union Territory of Jammu & Kashmir on EPC mode. NHIDCL 118.41 Cr OASIS-VIPL JV
Construction of ROB at Project Ch. 146.533 of NH-56 (new NH-731) along with its approaches and associated slip roads on EPC Mode in the state of Uttar Pradesh. NHAI 79.72 Cr Vidya Infrabuilt Pvt. Ltd (Direct from NHAI)
Augmenting the existing road from km 786.000 to km 978.400 (approx. 192.4 km) Varanasi - Aurangabad section of National Highway No. 2 (NH - 2) in the State of Uttar Pradesh and Bihar by Six Laning on design, build, finance, operate and transfer ('DBFOT") basis ("Project"). Letter of Award for "Execution of Civil and associated works for structure works from CH Km 843.000 to Km 862.000 on Item Rate Contract Basis" in the state of Bihar, India. NHAI 80.23 Cr SOMA INDUS Varanasi Aurangabad Tollway Pvt. Ltd
Strengthening and widening of RME from RD. 16500 M to RD. 18360 M. (From jagat bund to Suplemenatry drain)(Both side) I&FC 6.43 Cr Vidya Infrabuilt Pvt. Ltd (Direct from I&FC)